Amid China tensions, India to build third aircraft carrier

NEW DELHI (GDC) — The commissioning of India’s second aircraft carrier has been delayed till September next year because of the Covid-19 pandemic according to Times of India.

While reconciling to this setback, the Indian Navy remains all the keener to push its case for a third aircraft carrier as well as two new fighter squadrons to counter China’s expanding footprint in the Indian Ocean Region.

As the US Navy projected its power in the South China Sea, much to China’s discomfort, nothing projects raw combat power like an aircraft carrier strike group capable of moving over 500 nautical miles (900 km) in a single day.

But India, which has currently deployed the bulk of its warships and submarines in the Indian ocean to send a clear signal to Beijing, is in danger of losing its decisive edge over China in the carrier strike group arena.

Sources say the “basin trials” of the first indigenous aircraft carrier (IAC-I) being built at the Cochin Shipyard, which would have checked the 40,000-tonne warship’s propulsion, transmission and shafting systems, have been derailed by the pandemic.

The basin trials of IAC-I, first sanctioned by the government way back in January 2003, are to be followed by extensive sea trials. It’s only after IAC-I gets commissioned in September 2021 now, and is christened INS Vikrant, that the “flight trials” will be launched to make the carrier fully operational by 2022-2023. The continuing delay in IAC-I, being constructed for Rs 22,590 crore, comes when 

China already has two aircraft carriers, while two more are being frenetically constructed. With the eventual aim to have a 10-carrier Navy by 2050, China is expected to begin deploying a carrier strike group in the Indian ocean within the next few years to take care of its “Malacca Straight”.

Sources said Navy will once again push for grant of “acceptance of necessity (AoN)” for a third carrier, the 65,000-tonne IAC-II (tentatively christened INS Vishal), which has been pending since May 2015.

Having earlier junked nuclear-propulsion for IAC-II to bring down the price, the Navy contends the projected Rs 45,000 crore construction cost will be spread over 10-14 years, with the bulk of it being ploughed back into the country’s economy, as was earlier reported by Times of India.

Boeing Super Hornet launches from US Aircraft Carrier. Super Hornet is one of the competitors of Indian Navy’s deck-based fighter requirement.

The proposal may well sail through this time, with the government fast-tracking some long-pending defense projects due to the military confrontation with China.

Similarly, the Indian Navy has also produced its requirement of 57 multi-role fighters capable of operating from carriers to about 36 (two squadrons) now. The Boeing Super Hornet and Dassault Rafale are competing for the Indian Navy’s requirements.

© 2020, GDC. © GDC and www.globaldefensecorp.com. Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to www.globaldefensecorp.com with appropriate and specific direction to the original content.

Be the first to comment

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.