Brazil’s Nuclear-Powered Submarine Project SN-BR Making Progress

In a ceremony held on November 25, the Brazilian Navy signed an agreement to start building the hull of its first nuclear-powered submarine (SSN), the “Álvaro Alberto”, as part of the SN-BR project.

According to an official press release, the “First Partial Construction License (LPC1)” was signed by the Brazilian Navy’s Directorate-General of Nuclear and Technological Development, the Naval Authority for Nuclear Safety and Quality and Fleet Admiral Marcos Sampaio Olsen.

The event saw the participation of authorities and representatives from nuclear sector institutions, such as the International Atomic Energy Agency, the Brazilian-Argentine Agency for Accounting and Control of Nuclear Materials, and the National Nuclear Energy Commission.

PROSUB and SN-BR

The General Coordination Office for the Nuclear Propulsion Submarine Development Program (COGESN), as the applicant, submitted to ANSNQ, through the Naval Agency for Nuclear Safety and Quality (AgNSNQ), a set of documents related to the SN-BR, in compliance with the safety requirements necessary for naval nuclear licensing. AgNSNQ, which provides technical support to the Authority’s decision-making, through its Technical Advisory Committee, evaluated COGESN’s request and manifested favorably to ANSNQ’s LPC1 Concession. The issuance of this 1st license meets one of the prerequisites for the applicant to contract the construction site and begin construction of the submarine pressure hull.

The LPC1 is the result of a strategy that aims to proceed with the licensing in well-defined stages, in order to allow an adequate level of detail in future analyses. The strategy reflects the Navy’s commitment to achieve the highest level of safety required for a project of this magnitude, which is unprecedented, complex, and challenging.



Brazilian Navy statement

About PROSUB and SN-BR

For the record, the PROSUB program calls for the design and construction of four Riachuelo-class conventional submarines (SB-R), the design of the future nuclear-powered submarine (SN-BR) and the design of a naval base in ItaguaÏ. French shipbuilder Naval Group is assisting Brazil in all steps of the PROSUB program (the conventional submarines, the naval base and the non nuclear aspects of the SN-BR).

Regarding the conventional submarine, the Riachuelo  (S40) was launched on December 14 2018 and started its trials in September 2019. It is set to be commissioned with the Brazilian Navy in Q1 2022. The launch of the second submarine of the class, Humaitá (S41) took place 11 December 2020. The same day, the forward and aft sections of the third submarine, Tonelero (S42), were joined and welded. Tonelero (S42) and Angostura (S43) are set to be launched in 2021 and 2022 respectively. The Álvaro Alberto, the first Brazilian submarine with nuclear propulsion (SN-BR), is due to be launched in 2031. The SN-BR, as well as the incorporation of the four Riachuelo-class submarines will increase the capacity of the Brazilian Navy to respond efficiently to the enormous challenge of controlling and protecting the “Blue Amazon”, which represents one third of the country’s borders.

© 2021, GDC. © GDC and www.globaldefensecorp.com. Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to www.globaldefensecorp.com with appropriate and specific direction to the original content.

Be the first to comment

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.