Canada started the construction of state-of-the-art river-class destroyers

The Canadian Surface Combatants (CSC) will be known as the River-Class Destroyers. The first three warships will be named HMC Ships Fraser, Saint-Laurent and Mackenzie.

Today, the Honourable Bill Blair, Minister of National Defence, joined by Vice-Admiral Angus Topshee, Commander of the Royal Canadian Navy (RCN) and Dirk Lesko, President of Irving Shipbuilding Inc., celebrated the start of construction activities for Canada’s new fleet of Canadian Surface Combatants (CSC).

Minister Blair and Vice-Admiral Topshee also announced that the new fleet of warships will be known as River-class destroyers, and the first three ships will be named His Majesty’s Canadian Ships (HMCS) Fraser, Saint-Laurent, and Mackenzie.

Ship names are chosen carefully, and they tell the story of the RCN. Not only are these three ships named after Canada’s most important waterways that reach the Pacific, Atlantic, and Arctic oceans, they are also a tribute to previous Canadian warships with the same names – ships that made heroic wartime contributions and represented cutting-edge technological innovation. The RCN intends to foster a sense of pride in our sailors by connecting these ships to Canada’s maritime heritage.

The CSC project is the largest and most complex shipbuilding initiative in Canada since the Second World War and represents a historic investment into the recapitalization of the RCN’s surface fleet. This project will equip the RCN with new, state-of-the-art warships to bolster Canada’s naval capabilities at home, and abroad, for decades to come. The River-class will be Canada’s major component of maritime combat power, enabling us to continue to monitor and defend our own coastal waters, and contribute significantly to international naval operations alongside our Allies.

Today marked the start of construction on the production test module (PTM), through which the Government of Canada and Irving Shipbuilding Inc. will be able to test and streamline processes, and implement lessons learned into the build process, to enable the start of full rate production in 2025. Delivery of the first River-class destroyer, HMCS Fraser, is expected in the early 2030s, with the final ship expected by 2050.

The CSC project will support sustainable growth in Canada’s marine supply chain. The build phase of CSC will create and/or maintain approximately 10,800 jobs annually throughout the 25-year construction period across the country. The design phase of the project will create and/or maintain approximately 5,000 Canadian jobs annually across the economy. In total, this project will generate at least $40 billion in cumulative Gross Domestic Product.

As indicated in our renewed vision for defence, Our North, Strong and Free, the Government of Canada is committed to a renewed relationship with Canada’s defence industry, based on clarity, certainty, and long-term partnership. The CSC project is an excellent example of how the Government of Canada is investing in Canada’s domestic shipbuilding industry, while also equipping the RCN with a fleet of modern and effective ships to support operations well into the future.

The CSC is based on BAE Systems’ Type 26 warship design being built by the United Kingdom and Australia. The ships will have enhanced underwater sensors, state-of-the-art radar, and modern weapons.

The official NATO Ship Designator for the River-class warship will be DDGH – a destroyer (DD), guided (G) missile, helicopter (H) capable. As the RCN’s next generation combat ship, it replaces both the Iroquois-class destroyers and the Halifax-class frigates. As a powerful and multi-functional ship, the River-class warship is by definition a destroyer: a fast, manoeuvrable, anti-aircraft and anti-submarine long-endurance warship, which can escort larger vessels in a fleet, convoy, or carrier battle group and defend them against a wide range of general threats.

“Today, we launch construction on the largest Canadian shipbuilding project since the Second World War, marking an historic milestone for the Royal Canadian Navy. The River-class destroyers will provide the Canadian Armed Forces with the tools that they need to defend our national interests for decades to come – and ensure that Canada can deploy a state-of-the-art, combat-ready fleet of warships to defend our country and support our allies. As we invest in this new fleet, we are also supporting Canada’s shipbuilding industry and thousands of well-paying, skilled jobs. Bravo Zulu to everyone who has helped us reach this important day.”  

The Honourable Bill Blair, Minister of National Defence

The CSC will replace the capabilities found in both the retired Iroquois-class destroyers (four) and the Halifax-class frigates (12) with a single, and combat-capable ship to meet multiple threats on both the open ocean and in the highly complex coastal environment.

The CSC project is currently budgeted at between $56-60 billion (before taxes), and includes the cost for 15 new, state-of-the-art warships, as well as all the components required to design, build, and bring these ships into service (design work, infrastructure, ammunition, technical data, initial training, project management, and contingency costs).

© 2024, GDC. © GDC and www.globaldefensecorp.com. Unauthorized use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to www.globaldefensecorp.com with appropriate and specific direction to the original content.

Be the first to comment

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.